3M VHB Cleaner
Prod Code: VHB009800
![3M VHB Cleaner](http://www.vikingtapes.co.uk/cdn/shop/products/529_1024x.jpg?v=1547113613)
Only £21.37 GBP (inc VAT)
£17.81 GBP (ex VAT)
Prod Code: VHB009800
- Degreasing of surfaces
- Preparation of surfaces for bonding
Sold in 1 Litre Cans.
Surface Preparation Details.
To obtain optimum adhesion, the bonding surfaces must be clean, dry and well unified. Typical cleaning solvents are 3M™ VHB Cleaner, a mix of isopropyl alcohol and water or heptane.
Be sure to follow solvent manufacturer's directions for use and precautionary warnings when using solvents (Steps A & B)
Bond strength is dependent upon the degree of adhesive-to-surface contact developed. Firm application pressure helps better adhesive contact and thus improves bond strength (Steps C & D)
After application, the bond strength will increase as the adhesive flows into the surface. At room temperature approximately 50% of the ultimate strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours. In some cases bond strength can be increased and ultimate bond strength can be achieved more quickly by exposure of the bond to elevated temperatures (eg. 70°C for 1 hour). This provides better adhesive wetout onto the substrates.
NB: Cannot be shipped outside the UK
Sorry, there are no products in this collection
- Degreasing of surfaces
- Preparation of surfaces for bonding
Sold in 1 Litre Cans.
Surface Preparation Details.
To obtain optimum adhesion, the bonding surfaces must be clean, dry and well unified. Typical cleaning solvents are 3M™ VHB Cleaner, a mix of isopropyl alcohol and water or heptane.
Be sure to follow solvent manufacturer's directions for use and precautionary warnings when using solvents (Steps A & B)
Bond strength is dependent upon the degree of adhesive-to-surface contact developed. Firm application pressure helps better adhesive contact and thus improves bond strength (Steps C & D)
After application, the bond strength will increase as the adhesive flows into the surface. At room temperature approximately 50% of the ultimate strength will be achieved after 20 minutes, 90% after 24 hours and 100% after 72 hours. In some cases bond strength can be increased and ultimate bond strength can be achieved more quickly by exposure of the bond to elevated temperatures (eg. 70°C for 1 hour). This provides better adhesive wetout onto the substrates.
NB: Cannot be shipped outside the UK
For full specifications Click here
Need more help or advice? Ask technical
![Close](http://www.vikingtapes.co.uk/cdn/shop/t/93/assets/icon-closepopup.png?v=48657090257066722111662476802)
![Tech Landing Image](http://www.vikingtapes.co.uk/cdn/shop/files/tech_landing_v3.jpeg?v=1615802157)
Need Help?
Give us a call, drop us an email, or simply fill in the form and one of the team will get back to you.
- +44 (0) 1535 610 373
- sales@vikingtapes.co.uk
- Unit 1, Coronation Business Park,
Hard Ings Rd, Keighley,
West Yorkshire,
BD21 3ND
![Success Tick](http://www.vikingtapes.co.uk/cdn/shop/t/93/assets/icon-tick.png?v=98527608022300506331662476806)
![Close](http://www.vikingtapes.co.uk/cdn/shop/t/93/assets/icon-closepopup.png?v=48657090257066722111662476802)